{"id":2088,"date":"2019-07-02T10:37:52","date_gmt":"2019-07-02T08:37:52","guid":{"rendered":"https:\/\/www.lantania.com\/lantania-electrificara-el-primer-tramo-del-ave-a-extremadura\/"},"modified":"2025-08-19T13:02:29","modified_gmt":"2025-08-19T11:02:29","slug":"lantania-electrificara-el-primer-tramo-del-ave-a-extremadura","status":"publish","type":"post","link":"https:\/\/www.lantania.com\/en\/lantania-electrificara-el-primer-tramo-del-ave-a-extremadura\/","title":{"rendered":"Lantania Will Electrify the First Section of the High-Speed Rail Corridor to Extremadura"},"content":{"rendered":"<p>&nbsp;<\/p>\n<ul style=\"font-size: 22px; line-height: 1.4em; font-weight: 600; list-style: none; margin-left: 0; padding-left: 85px; text-indent: -85px;\">\n<li style=\"margin-bottom: 20px;\"><img decoding=\"async\" src=\"https:\/\/www.lantania.com\/wp-content\/uploads\/2018\/08\/bullet.svg\" class=\"ic x0_5\" \/> Adif awards Lantania, Sacyr Neopul, and Comsa the first contract, totalizing \u20ac30.12 million, to electrify the Plasencia-Badajoz section of the Madrid-Extremadura high speed rail corridor<\/li>\n<\/ul>\n<p><strong>Madrid, 2 July 2019. <\/strong> The Board of Directors of Adif, High-Speed Division, has granted the Joint Venture formed by Lantania, Sacyr Neopul, and Comsa Instalaciones y Sistemas Industriales with the first contract for the electrification of the Plasencia-Badajoz section of the Madrid-Extremadura High-Speed rail corridor, totalizing \u20ac30.12 million.<\/p>\n<p>The works include the erection of the overhead line (catenary) between Plasencia and the Pe\u00f1as Blancas fork, along 125 km. The work will be carried out on four different sections.<\/p>\n<p>This project also includes the electrification of the Plasencia and C\u00e1ceres stations, along with the Train Overtaking and Parking Posts (PAET) in Aldea del Cano and the Automatic Block Signalling Station (PB).<\/p>\n<p>The construction is expected to start at the end of 2019 and last for 18 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Adif awards Lantania, Sacyr Neopul, and Comsa the first contract, totalizing \u20ac30.12 million, to electrify the Plasencia-Badajoz section of the Madrid-Extremadura high speed rail corridor Madrid, 2 July 2019. The Board of Directors of Adif, High-Speed Division, has granted the Joint Venture formed by Lantania, Sacyr Neopul, and Comsa Instalaciones y Sistemas Industriales with [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/www.lantania.com\/en\/lantania-electrificara-el-primer-tramo-del-ave-a-extremadura\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1970,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[25],"tags":[],"class_list":["post-2088","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria-en-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/posts\/2088","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/comments?post=2088"}],"version-history":[{"count":6,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/posts\/2088\/revisions"}],"predecessor-version":[{"id":10392,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/posts\/2088\/revisions\/10392"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/media\/1970"}],"wp:attachment":[{"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/media?parent=2088"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/categories?post=2088"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/tags?post=2088"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}