{"id":9697,"date":"2025-03-11T12:01:40","date_gmt":"2025-03-11T10:01:40","guid":{"rendered":"https:\/\/www.lantania.com\/?p=9697"},"modified":"2025-08-08T15:09:53","modified_gmt":"2025-08-08T13:09:53","slug":"lantania-completes-construction-of-the-hernan-valle-forest-defence-centre-in-granada","status":"publish","type":"post","link":"https:\/\/www.lantania.com\/en\/lantania-completes-construction-of-the-hernan-valle-forest-defence-centre-in-granada\/","title":{"rendered":"Lantania completes construction of the Hern\u00e1n-Valle Forest Defence Centre in Granada"},"content":{"rendered":"<ul style=\"font-size: 22px; line-height: 1.4em; font-weight: 600; list-style: none; margin-left: 0; padding-left: 85px; text-indent: -85px;\">\n<li style=\"margin-bottom: 20px;\"><img decoding=\"async\" src=\"https:\/\/www.lantania.com\/wp-content\/uploads\/2018\/08\/bullet.svg\" class=\"ic x0_5\" \/> The Regional Government of Andalusia inaugurates this facility, which will support Infoca&#8217;s ground, air and personnel resources<\/li>\n<li><\/li>\n<\/ul>\n<p><strong>Madrid, 11 March 2025. <\/strong>Lantania, in a joint venture with Francisco Lucas, has completed the construction of the new Hern\u00e1n-Valle Forest Defence Centre (Cedefo) in Guadix, in the province of Granada. This infrastructure, with an investment of \u20ac7 million, strengthens the capacities of the Andalusian Forest Fire Emergency Plan (Infoca), providing support for ground, air and personnel resources.<\/p>\n<p>The Hern\u00e1n-Valle Cedefo is a strategic hub for monitoring the eastern region of Andalusia, as it houses Infoca\u2019s resources, enabling faster wildfire detection and suppression in Granada, Almer\u00eda, and Ja\u00e9n.<\/p>\n<p>The Minister of the Presidency, Interior, Social Dialogue and Administrative Simplification of the Regional Government of Andalusia, Antonio Sanz, has been in charge of inaugurating today this new facility, along with the Regional Government Delegate in Granada, Antonio Granados, the Technical Director of the Regional Operations Centre (COR), Cesar Vicente Fernandez, and the Mayor of Guadix, Jesus Lorente. All of them were accompanied by Lantania&#8217;s Business Development Director, Jos\u00e9 Nofuentes and the Civil Works Delegate for the South-Central Zone, Rub\u00e9n Corral.<\/p>\n<p>The new Cedefo covers a total area of 13.5 hectares. Lantania has upgraded and extended the runway to allow the parking of two light aircraft and six helicopters and has built two new platforms for aerial vehicles and complementary refuelling facilities.<\/p>\n<p>The works included the construction of three buildings: one main office building for Cedefo&#8217;s activities, a facility for the temporary accommodation of the pilots assigned to the centre and a warehouse for parking, refuelling and filling firefighting trucks, among other activities. The entire infrastructure is located in an urbanised area of about 8,730.00 m\u00b2, of which 2,165.95 m\u00b2 corresponds to the built-up area, while the rest is for parking, manoeuvring, access and physical preparation spaces.<\/p>\n<p>The project also included an access road and a new power line to serve the centre. The new Cedefo also has a sanitation network with collection and reuse of rainwater and a sewage treatment system. A well and a water treatment system have been built to provide the necessary hygienic conditions to supply the centre with drinking water.<\/p>\n<p>The project has been financed by the European Regional Development Fund (ERDF).<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Regional Government of Andalusia inaugurates this facility, which will support Infoca&#8217;s ground, air and personnel resources Madrid, 11 March 2025. Lantania, in a joint venture with Francisco Lucas, has completed the construction of the new Hern\u00e1n-Valle Forest Defence Centre (Cedefo) in Guadix, in the province of Granada. This infrastructure, with an investment of \u20ac7 [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/www.lantania.com\/en\/lantania-completes-construction-of-the-hernan-valle-forest-defence-centre-in-granada\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":3,"featured_media":9701,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[25],"tags":[],"class_list":["post-9697","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria-en-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/posts\/9697","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/comments?post=9697"}],"version-history":[{"count":3,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/posts\/9697\/revisions"}],"predecessor-version":[{"id":10236,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/posts\/9697\/revisions\/10236"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/media\/9701"}],"wp:attachment":[{"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/media?parent=9697"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/categories?post=9697"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lantania.com\/en\/wp-json\/wp\/v2\/tags?post=9697"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}