About:mcupeiro
Posts by mcupeiro :
- Lantania to build Casatejada electrical substation (Cáceres) for the Madrid-Extremadura High-Speed Rail Line (LAV), Posted on in Sin categoría
- Lantania installs new pedestrian and cyclist walkway connecting Puente and Villa de Vallecas, Posted on in Sin categoría
- Lantania builds the ‘Tordesillas T2’ electrical substation, a €9.2 million project, Posted on in Sin categoría
- Lantania will build a 600,000m3/day desalination plant in Saudi Arabia, Posted on in Sin categoría
- Lantania enters North Macedonia with the construction of a WWTP in Bitola, Posted on in Sin categoría
- Lantania ends the first half of 2025 with 12.8% growth and more than €400 million in contracts, Posted on in Sin categoría
- Lantania and Gyocivil begin development of Los Pocillos in Villanueva de la Cañada (Madrid), Posted on in Sin categoría
- Lantania begins work on the third section of Seville Metro Line 3 North, Posted on in Sin categoría
- Lantania to build 4.5 MWp solar photovoltaic plant for Alicante desalination facility, Posted on in Sin categoría
- Lantania allocates €1.2 million to resources for environmental risk management and prevention, Posted on in Sin categoría