Solar photovoltaic farm in Tordesillas (Valladolid)
Type of work:
Renewable energy
Clients:
Solaria
Location:
Spain
  • 125 MW

    capacity

  • 370,000

    solar panels

Solar photovoltaic farm in Tordesillas (Valladolid)

The project includes the engineering and construction of four solar farms of 125 MW in total and their evacuation infrastructure for Solaria, located in Medina del Campo and Tordesillas (Valladolid). It covers an area of 260 hectares and consists of more than 370,000 photovoltaic solar panels, two 30/45 kV substations, a 220/30 kV generation substation and 16 transformer stations.