400kV HV power line for the Totana traction substation (Murcia)
Type of work:
T&D
Clients:
Spanish Railway Infrastructures Administrator (ADIF)
Location:
Spain

400kV HV power line for the Totana traction substation (Murcia)

Lantania is building a high-voltage power line from the Totana substation of Red Eléctrica de España (REE) to the Adif AV traction power substation in that town.

The project consists of a 400 kV two-phase double-circuit overhead line, 12.5 km long, made up of 36 lattice supports with two cables per phase and two ground cables, standard and OPGW.