The company, in a joint venture with Sacyr, was awarded a €35 million Adif AV contract to install and maintain the catenary systema on the Talayuela-Plasencia section Madrid, 25 November 2025. Lantania will be responsible for installing and maintaining the catenary system on the second section of the Madrid–Extremadura High-Speed Line (LAV). The infrastructure, water […]
Lantania to perform the electrification works on the second section of the Madrid–Extremadura high-speed line